사업소개

사업소개

Project

Inchangcheon aquatic ecosystem restoration plan establishment service

  • 발주처

    Guri City

  • 사업기간

    2023.03-2023.03

Inchangcheon Water Ecosystem Restoration Plan

  • 사업규격

    Covered section of Inchangcheon Stream: L=490m B =18m
    ○ Other small streams: Anmal (1) Gaeulcheon, Umicheon, Baekgyocheon, Saetdaricheon
  • 프로젝트
    이미지

  • 사업설명

    Establish a restoration plan to provide a pleasant resting and leisure space for citizens by first creating a waterfront space with a vital ecological stream and a resting place in the former Inchangcheon Stream, which has been covered and used as a parking lot. Searching for multilateral measures for restoration, such as securing the health of the water ecosystem, selecting restoration priorities and planning restoration directions considering feasibility and economic feasibility